topleft CSBA.org >  Services >  Governance Technology > 

Legal Resources | Education Code |  EC  67359.7  

Construction of instructional and research facilities   

arrow Previous bar Next arrow

The State Public Works Board may construct the following higher education instructional and research facilities to be financed from the Public Buildings Construction Fund, from proceeds from the sale of bonds, negotiable notes, or negotiable bond anticipation notes for the construction of those facilities pursuant to Chapter 3.8 (commencing with Section 15820.50) of Part 10b of Division 3 of Title 2 of the Government Code:

(a) University of California:

(1) Davis Campus:

99.03.090 Social Science and Humanities Building -Working drawings and construction (The sum of twenty-three million seven hundred seventeen thousand dollars) $23,717,000

(2) Riverside Campus:

99.05.050 Engineering Sciences Building-Working drawings and construction (The sum of thirty-six million three hundred thousand dollars) $36,300,000

(3) San Diego Campus:

99.08.085 Engineering Building Unit 2-Working drawings and construction (The sum of twenty-five million two hundred eighty-six thousand dollars) $25,286,000

(b) The California State University:

(1) California State University, Long Beach:

06.71.092 Renovate Applied Arts and Sciences and Additions-Working drawings and construction (The sum of eighteen million seven hundred fifty-eight thousand dollars) $18,758,000

(2) California State University, Northridge:

06.82.069 Engineering Addition, Asbestos Abatement, Renovation, Phase I-Working drawings and construction (The sum of twelve million seven hundred nineteen thousand dollars) $12,719,000

(3) California State University, San Bernardino:

06.78.070 Health, Physical Education, Classroom and Faculty Office Complex-Working drawings and construction (The sum of twenty-two million eleven thousand dollars) $22,011,000

(Added by Stats. 1992, Ch. 13, Sec. 2.)

Reference:

Government Code 15820.50